Sunday, October 26, 2025

FASCINATING FACTS: INDIRA GANDHI CANAL IN THAR DESERT



INDIRA GANDHI CANAL IN THAR DESERT 

The 960 km canal under the Thar Desert Revival Plan refers to the ambitious Indira Gandhi Canal Project, which is India’s largest canal system designed to transform the arid Thar Desert, especially in Rajasthan, into a fertile and productive region through irrigation and water supply from northern rivers

Canal Overview and Historical Background

The Indira Gandhi Canal (formerly Rajasthan Canal) was conceived as a means to permanently combat drought and water scarcity in the Thar Desert after India's independence

The canal's main source is water diverted from the Harike Barrage at the confluence of the Sutlej and Beas rivers in Punjab, then routed across northern Rajasthan

Its main canal length is quoted variously as approximately 649 km to 837 km, but including all branch canals and distribution systems, the total reaches about 9,245 km of irrigation channels

The construction began in the 1950s, with major milestones completed in 1983 and further expansion since.


Scientific and Ecological Impact

This canal project has brought irrigation to nearly 3.8 million acres (about 15.4 lakh hectares) of previously arid land.

Positive outcomes include significant agricultural production, supporting local farmers, and an increase in greenery in parts of the desert, as well as rising groundwater levels due to consistent water supply from the canal.

However, satellite analysis exposes limitations: the region still suffers from barren patches, shifting sand dunes occasionally bury canal sections, water logging, salinity problems, siltation, and seepage, making effective irrigation a challenge

Socio-Economic and Environmental Challenges

While the canal is celebrated as the LIFELINE OF THE DESERT  for many farming communities, there are notable adverse effects, such as increased water-borne diseases related to stagnant canal water, soil salinity, and periodic water shortages when river supply is limited

The transformative goals of 'greening the desert' are only partially realized; most dramatic changes are seen near canal routes, and vast desert stretches remain challenging for sustainable cropping, as confirmed by recent satellite data and field studies

Recent Developments and Policy Context

Modern expansion and maintenance have focused on efficient water management and the construction of distribution systems with control gates, though government claims of complete desert revival are sometimes contested by scientific data

Challenges remain regarding climate change, fluctuating monsoon patterns, and the need for balancing water needs between urban, farming, and natural ecosystems

Conclusion

India’s Thar Desert canal project is an ENGINEERING MARVEL  that has brought water, agriculture, and new life to parts of Rajasthan. Yet its actual revival effect is mixed: the ambitious 960 km canal has substantially improved livelihoods near its route, but sustainable, widespread desert greening still faces ecological and scientific hurdles as revealed by recent analyses.

The government is actively pursuing integrated drainage systems, environmental restoration, reservoir development, promotion of modern irrigation methods like sprinklers, and link canal projects to enhance water distribution and canal efficiency. Political aspects also influence water sharing and maintenance priorities. Overall, the canal is functioning as a crucial lifeline but requires ongoing upgrades and sustainable management to address ecological and socio-economic challenges for the long term. 

Grateful thanks to PERPLEXITY AI for its great help and support in creating this blogpost.

No comments:

Post a Comment